Verilink NCC Craft Port -- END TESTS --


If any loops or tests have been started in the LOCAL CSU, they may be ended using

                   N) end tests 
The tests which can be ended using N) end tests include:

__eq loops__, __net signals__ L) line loop and P) payload loop.

If U) inband up has been used to put a far end CSU into a line loop, then D) inband down must be used to end that test.


Return to Diagnostics Menu

Return to NCC Craft Tutorial